Qualification Lot

A qualification lot is a special lot of wafers processed to validate that a new process, equipment, recipe, or material change meets all specifications before production release. Purpose: Demonstrate that the change produces results equivalent to or better than the existing qualified process. Risk mitigation before committing production material. Triggers: New tool installation, major preventive maintenance, recipe change, new material supplier, process improvement implementation, technology transfer. Contents: Multiple wafers (13-25 typically) representing full process conditions. May include multiple product types or test vehicles. Test plan: Comprehensive measurement plan covering all critical parameters - CD, thickness, overlay, defects, parametric electrical results, reliability. Acceptance criteria: Pre-defined specifications that qualification lot must meet. Usually same as production specifications, sometimes tighter. Duration: Qualification process can take days to weeks depending on scope. Full process qual may require processing through entire flow. Short-loop qualification: Process only the changed steps plus key downstream steps rather than full flow. Faster but less comprehensive. Split lot: May split qualification lot between qualified and new process for direct comparison. Statistical requirements: Multiple wafers and sites to demonstrate process capability (Cpk) with statistical confidence. Sign-off: Qualification results reviewed and signed off by process engineering, quality, and manufacturing management. Documentation: Formal qualification report with all data, analysis, and approval signatures. Retained for audits and regulatory compliance.

Take qualification lot further

Ask the copilot about this term, or have our engineers assess it against your process.