Uph (units per Hour)

Units per hour (UPH) measures wafers or lots processed per hour, quantifying tool or process step throughput in semiconductor manufacturing. Calculation: UPH = (Wafers processed) / (Production time in hours). Related metrics: (1) Cycle time per wafer (seconds/wafer = 3600/UPH); (2) Lots per hour; (3) Wafer starts per week (WSPW—fab-level). UPH components: actual process time + wafer handling time + overhead (alignment, pump/vent, chamber transfer). UPH by tool type: (1) Steppers: 100-300 WPH depending on layers; (2) Etch: 20-80 WPH depending on process; (3) CVD: 15-50 WPH depending on film thickness; (4) Furnaces: variable (batch tool, 50-200 wafers at once). UPH improvements: reduce handler time (faster robots), parallel processing (multi-chamber tools), recipe optimization (shorter process time if within spec), eliminate waits (better scheduling). Bottleneck impact: UPH of bottleneck tool directly limits fab capacity. Capacity planning: Required tools = (WSPW × cycle time) / (Available hours × UPH × utilization). UPH vs. quality: increasing UPH may impact process quality—must validate. Monitoring: MES tracks wafer events, calculates real-time and historical UPH. Critical for capacity planning, bottleneck identification, and continuous improvement targeting.

Take uph (units per hour) further

Ask the copilot about this term, or have our engineers assess it against your process.